Westenedge Drive Improvement Project

Westenedge Drive Improvement Project
Location: National Road to Rocky Ford Road
Westenedge Drive is an urban collector street and is a main artery to Parkside School, Schmitt School, Northside Middle School, North High School, and St. Bartholomew School.  This street is also a connecting route for the Columbus People Trail system.  Pedestrian and bicycle traffic is prevalent.  The new street will provide one lane in each direction in addition to bicycle lanes.  Sidewalks will be constructed along both sides of the street.  A storm water infiltration system is also included.  Construction plans have been completed for the improvement of this section of street.  The funding source for the project is 80% federal funds and 20% local (thoroughfare fund).  Construction of this project has been postponed indefinitely.

Project Data:
Traffic Volume: 4,028 vehicles per day 2010
Future Traffic Volume: 5,965 vehicles per day 2030
Project Length: 2,282.72 feet
Right-of-Way: None
Designer: Christopher B. Burke Engineering
Estimated Construction Cost: $1,500,000
 

Updated March 8, 2013


 

©2014 City of Columbus Indiana | Contact Us | Site Map | Website Credits