Chapter 13.04 PUBLIC WORKS CONSTRUCTION
Section 13.04.040 Contractors--Disposition and removal of surplus materials.
13.04.040 ContractorsDisposition and removal of surplus materials.
In all contracts made with the city, the surplus excavated material
shall be deemed to be the
property of the city, unless previously removed by the owner of the abutting property, and shall be
removed by the contractor at his expense to such point as shall be designated by the city engineer;
provided, that such free haul shall in no case for each separate block exceed three-fourths of a mile,
beyond which the contractor shall receive one cent per cubic yard for each one hundred foot haul.
In all private contracts, the owner of the abutting property or the contractor must remove all
surplus excavated materials. (Prior code § 27-43)