Chapter 16.24 DESIGN STANDARDS
Section 16.24.110 Soil erosion.
16.24.110 Soil erosion.
Since considerable soil erosion can take place during the subdivision
construction, development
plans shall contain proposed erosion and sediment control measures. These measures shall be
incorporated into the final plan and final construction drawings. Erosion and sediment control
measures shall conform to the standards and specifications established by the engineering
department. The measures shall apply to all features of the construction site, including street and
utility installations as well as to the protection of individual lots. Measures shall also be instituted
to prevent or control erosion and sedimentation during various stages of development.
A. General Principles. Practical combinations
of the following general principles will provide
effective sediment control when property planned and applied:
1. The development plan shall be fitted
to the topography and soils so as to create the least
erosion potential.
2. Removal of existing vegetation and
groundcover from an area shall be done as shortly as
possible before the construction of improvements, such as streets, storm sewers or other features of
the development.
3. Wherever feasible, natural vegetation
shall be retained and protected.
4. Where inadequate vegetation (groundcover)
exists, temporary or permanent vegetation shall
be established.
5. The smallest practical area of land
shall be exposed at any one time during development.
6. When land is exposed during development,
the exposure shall be kept to the shortest
practical period of time.
7. Critical areas exposed during construction
shall be protected with temporary mulching
and/or temporary vegetation, such as winter wheat or rye.
8. Sediment basins shall be installed
and maintained to remove sediment from runoff waters
from land undergoing development.
9. Provisions shall be made to accommodate
effectively the increased runoff caused by
changed soil and surface conditions during and after development.
10. The final permanent vegetation and
structures shall be installed as soon as practical in the
development. (Prior code § 28-47)